Analysis of accident and restoration times of 6-10 kV urban cable lines
https://doi.org/10.37493/2307-907X.2022.1.1
- Р Р‡.МессенРТвЂВВВВВВВВжер
- РћРТвЂВВВВВВВВнокласснРСвЂВВВВВВВВРєРСвЂВВВВВВВВ
- LiveJournal
- Telegram
- ВКонтакте
- РЎРєРѕРїРСвЂВВВВВВВВровать ссылку
Full Text:
Abstract
With the growth of energy consumption in cities and the reliability of power supply systems, more and more attention is paid. One of the indicators of the reliability of power supply to consumers is the average time of the post-emergency restoration of the line. When operating cable lines, it is important to have data on the flow of failures in cable lines and the average time of their recovery. And also take into account the seasonal changes in the flow of failures in urban cable lines and consider the influence of the flow of failures on the recovery time of the line.
About the Authors
D. PetrovRussian Federation
Denis Petrov, Candidate of Economic Sciences, Associate Professor of the Department Automated Energy Systems and Power Supply
V. Marugin
Russian Federation
Valery Marugin, Senior Lecturer, Department of Automated Electric Power Systems and Power Supply
A. Petrov
Russian Federation
Anton Petrov, Candidate of Engineering Science, Associate Professor of the Department Automated Energy Systems and Power Supply
References
1. Horol’skij, V. Ja. Tehniko-jekonomicheskoe obosnovanie diplomnyh proektov (Feasibility study of diploma projects) / V. Ja. Horol’skij, M. A. Taranov, D. V. Petrov. - Rostov-na-Donu : Terra, 2004. - 166 s.
2. Kisjuk, V. A. Diagnostika perekljuchajushhih ustrojstv bez vozbuzhdenija silovyh transformatorov (Diagnostics of switching devices without excitation of power transformers) / V. A. Kisjuk, N. E. Jurcev, D. V. Petrov, V. N. Sidel’nikov, D. A. Dobrikov // Metody i tehnicheskie sredstva povyshenija jeffektivnosti ispol’zovanija oborudovanija v promyshlennosti i sel’skom hozjajstve. - Stavropol’ : AGRUS, 2016. - S. 69-73.
3. Marugin, V. I. K voprosu o verojatnostnom ocenivanii sostojanija raspredelitel’nyh jelektricheskih setej (On the question of probabilistic assessment of the state of distribution electrical networks) / V. I. Marugin, A. S. Stepanov // Izvestija vysshih uchebnyh zavedenij. Jelektromehanika. - 2014. - No 3. - S. 12-14.
4. Rybakov, L. M. Analiz nadezhnosti kabel’nyh linij 10 kV (Analysis of the reliability of cable lines 10 kV) / L. M. Rybakov, A. E. Rylov // Izvestija vysshih uchebnyh zavedenij. Problemy jenergetiki. - 2003. - No 3-4. - S. 171-174.
5. Chistjakova, M. M. Analiz jekspluatacionnoj nadezhnosti kabel’nyh linij 6-10 kV gorodskogo rajona (Analysis of the operational reliability of 6-10 kV cable lines in the urban area) / M. M. Chistjakova, M. I. Bozhkov // Sovremennaja nauka i praktika. - 2016. - No 6 (11). - S. 19-24.
6. Petrov, D. V. Vlijanie otsrochek remonta kabel’nyh linij 6 i 10 kV na sroki provedenija remontnyh rabot (Influence of delays in repair of 6 and 10 kV cable lines on the timing of repair work) / D. V. Petrov, V. I. Marugin, S. I. Leshhev // Vestnik Severo-Kavkazskogo federal’nogo universiteta. - 2020. - No 4 (79). - S. 15-21.
7. Petrov, D. V. Raschet parametra potoka otkazov dlja kabel’nyh linij 6 i 10 kV goroda Stavropolja (Calculation of the parameter of the flow of failures for cable lines 6 and 10 kV of the city of Stavropol) / D. V. Petrov, M. R. Kitaev, R. E. Berezhnoj // Jelektrojenergetika glazami molodezhi : materialy IX Mezhdunarodnoj nauchno-tehnicheskoj konferencii. - Stavropol’, 2020. - S. 196-198.
8. Horol’skij, V. Ja. Tehniko-jekonomicheskie raschety raspredelitel’nyh jelektricheskih setej (Technical and economic calculations of electrical distribution networks) : uchebnoe posobie / V. Ja. Horol’skij, M. A. Taranov, D. V. Petrov. - Moskva : Forum, 2015. - 96 s.
9. Horol’skij, V. Ja. Jekspluatacija jelektrooborudovanija (Operation of electrical equipment) : uchebnoe posobie / V. Ja. Horol’skij, M. A. Taranov, V. N. Shemjakin. - Sankt-Peterburg : Lan’, 2017. - 326 s.
10. Anishhenko, V. A. Osnovy nadezhnosti sistem jelektrosnabzhenija (Fundamentals of reliability of power supply systems) : uchebnoe posobie / V. A. Anishhenko, I. V. Kolosova. - Minsk : BNTU, 2007. - 151 s.
Review
For citations:
Petrov D., Marugin V., Petrov A. Analysis of accident and restoration times of 6-10 kV urban cable lines. Newsletter of North-Caucasus Federal University. 2022;1(1):7-14. (In Russ.) https://doi.org/10.37493/2307-907X.2022.1.1